At the Loudoun County Fairgrounds, a major pathway was always muddy, particularly when the grounds were in heavy use. We graded the area and installed Ecoraster, an erosion-control grid system manufactured from 100 percent recycled plastic. The product is fully…
The large equipment storage area storage yard was always soft and muddy because of heavy use. Our approach, following a botched DIY attempt, was to first strip the surface gravel, excavate bad dirt areas, compact dirt then reinstall gravel. To…
The local community college needed to create a temporary parking area in an existing field – before the fall semester began. Our work began with grading of approximately 24,000 square feet, followed by installation of Ecoraster grid. Ecoraster is an…
A residential customer asked us to transform their muddy backyard into an acceptable wedding venue. We created a walking path and large sitting area with Ecoraster, an erosion-control grid system manufactured from 100 percent recycled plastic, and graded the rest…
WML was brought in by a local storm water engineer to repair an aging storm water pond. The pond bottom was shaped, trickle ditches were installed, and rip rap was placed over geotextile fabric. “WML Enterprises provided outstanding remediation work…