Working with All Phase Solutions, WML demolished and removed numerous structures from multiple sites throughout Virginia. This project was for the National Park Service in conjunction with the Appalachian Trail Conservatory. Over 100 tons of metal, wood, trash and debris…
At the Loudoun County Fairgrounds, a major pathway was always muddy, particularly when the grounds were in heavy use. We graded the area and installed Ecoraster, an erosion-control grid system manufactured from 100 percent recycled plastic. The product is fully…
The local community college needed to create a temporary parking area in an existing field – before the fall semester began. Our work began with grading of approximately 24,000 square feet, followed by installation of Ecoraster grid. Ecoraster is an…
For the Strothers Lane tank project, WML removed a 3,000,000-gallon water tank with lead paint. The tank thickness varied and its size required specialized equipment and crews, in addition to environmental monitoring for the lead removal. We safely removed the…